Date: 04/27/2009 Views: 4675
Date: 03/17/2008 Views: 2882
Date: 06/04/2003 Views: 3229
Date: 08/23/2023 Views: 84125
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.