|
DSCF0002
Date: 12/31/2008
Views: 2818
|
|
|
25092002183220_G
Date: 12/31/1969
Views: 2405
|
|
|
dscn0896
Date: 12/31/1969
Views: 2635
|
|
|
Ultimate ventilator installation and associated repair 7.
Date: 07/10/2009
Views: 3041
|
|
|
IMG_9571post
The fuel lines were tied with tie-wraps and 1/2" (12.7 mm) rubber fuel hose lengths. The vent hose was tied in as well by running it through short lengths of fuel hose and using tie-wraps to hold the rubber hose and protect the vent line from chafin
Date: 06/12/2010
Views: 3730
|
|
|
Plugs12Ann
Date: 06/25/2004
Views: 2509
|
|
|
IMG_2329
Date: 07/10/2005
Views: 3494
|
|
|
panel1
Date: 12/31/1969
Views: 5871
|
|
|
Lead to hold flat after heating.
Date: 01/11/2010
Views: 3170
|
|
|
Fin plumbing 3.
Date: 04/13/2009
Views: 2865
|
|
|
Starboard wing 68.
Date: 06/28/2009
Views: 3023
|
|
|
DSCN3231
Date: 12/31/1969
Views: 2433
|
|
|
LL2
Date: 01/15/2009
Views: 3346
|
|
|
IMG_7312
With one final overall fit of the tank.
Date: 02/17/2014
Views: 6251
|
|
|
Large_underbelly_inspection_cover_Y9_06_07
Date: 06/07/2009
Views: 2704
|
|
|
Cradle warp 1.
Date: 03/22/2009
Views: 3679
|
|
|
IMG_3390
Date: 10/24/2010
Views: 3114
|
|
|
MG_1483
Date: 07/09/2006
Views: 2996
|
|
|
ELT01Ann
Date: 07/31/2005
Views: 2199
|
|
|
IM002967
Date: 10/30/2007
Views: 3702
|
|