|
40_Spray_Booth
Date: 12/31/1969
Views: 1959
|
|
|
IM002945
Date: 10/30/2007
Views: 3000
|
|
|
Airmaster failure stud shears this is second one
Date: 02/21/2011
Views: 1619
|
|
|
IM003603
Date: 11/24/2007
Views: 4175
|
|
|
DSC00863
Date: 04/15/2005
Views: 2918
|
|
|
DSCN5458Ann
Date: 01/05/2007
Views: 3167
|
|
|
FUELKSYSTEMUNITS1
Date: 12/03/2006
Views: 3672
|
|
|
DSC00691_Texted
Date: 12/31/1969
Views: 12195
|
|
|
89_1_GP_s_helpeer
Date: 12/31/1969
Views: 2434
|
|
|
Wayne has warning PCB about 4/4 complete 4.
Date: 10/05/2010
Views: 3341
|
|
|
P1001027
Date: 10/31/2008
Views: 5021
|
|
|
Mass_Balance_Tower_04
Date: 01/23/2006
Views: 3048
|
|
|
DSCN3148
Date: 09/12/2009
Views: 5200
|
|
|
SingletonMod13Ann
Date: 06/11/2004
Views: 2625
|
|
|
IMG_2310
Date: 05/24/2005
Views: 3374
|
|
|
New_Cowl_01
New lip on cowl. A hole 14" X 7" was opened in the cowl. A piece of 4" PVC was used as a mold to form a lip on the edge of it, the idea being to create a low pressure area.
Date: 08/31/2011
Views: 13740
|
|
|
DSCF0011
Date: 08/03/2009
Views: 3889
|
|
|
IMG_6783small
Date: 02/23/2008
Views: 2874
|
|
|
Second and final pass of Port top wingskin bond on 3.
Date: 09/13/2010
Views: 3187
|
|
|
11Inverted_from_front
Date: 09/03/2004
Views: 3202
|
|