Date: 11/29/1999 Views: 3000
Date: 07/20/2009 Views: 2536
Date: 02/02/2009 Views: 2516
Date: 08/23/2023 Views: 85807
Date: 05/23/2007 Views: 532754
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.