|
dsc09065
Stbd side peel ply removed.
Date: 01/25/2013
Views: 8524
|
|
|
dsc09024
I was really anal about keeping the socket holes tight. This proved to be more work than it was worth and was fighting the tight fit when it came to locating the axles. Do yourself a favor and just make them a little bigger, 1/8 or so. This gap will be
Date: 01/22/2013
Views: 8263
|
|
|
p1000715
p1000715.jpg
Date: 03/12/2012
Views: 6622
|
|
|
dsc08611
Unused Mono wheel components. I'll probably be selling these soon.
Date: 04/10/2012
Views: 12990
|
|
|
p1000687
p1000687.jpg
Date: 03/12/2012
Views: 6705
|
|
|
dsc09063
Hey Bill!
Date: 01/24/2013
Views: 8001
|
|
|
dsc08602
Landing gear parts. The nose gear leg is having MOD 53 performed on it at my fauther in-laws.
Date: 04/10/2012
Views: 8882
|
|
|
nex_2014_01_12_04
Port LG in place with bolt in.
Date: 01/13/2014
Views: 6895
|
|
|
nex_2014_01_25_05
My lovely bride helping us out. Notice the jig is the mono wheel trailer.
Date: 01/25/2014
Views: 7356
|
|
|
p1000692
p1000692.jpg
Date: 03/12/2012
Views: 5912
|
|
|
nex_2013_08_24_06
Time for some clean up.
Date: 08/25/2013
Views: 7127
|
|
|
p1000702
p1000702.jpg
Date: 03/12/2012
Views: 5823
|
|
|
Close up of the relief cut.
Close up of the relief cut.
Date: 04/03/2016
Views: 13606
|
|
|
dsc08620
Removal of the mono firewall.
Date: 04/14/2012
Views: 15920
|
|
|
dsc09060
Wetting out stbd side.
Date: 01/24/2013
Views: 8133
|
|
|
nex_2014_01_25_01
Starboard side after Uni over ribs 3 and 4. Added Bid on the X to reinforce the cuts needed to get the Uni to lay flat. Also filled in Rib 1 air buble.
Date: 01/25/2014
Views: 7031
|
|
|
dsc09052
Wetting out stbd side.
Date: 01/24/2013
Views: 8425
|
|
|
p1000686
p1000686.jpg
Date: 03/12/2012
Views: 6129
|
|
|
dsc09069
Rib 2 stbd side.
Date: 01/25/2013
Views: 8629
|
|
|
nex_2014_01_12_05
Port side top.
Date: 01/13/2014
Views: 7012
|
|