|
dsc09033
Port side done.
Date: 01/22/2013
Views: 8879
|
|
|
dsc09063
Hey Bill!
Date: 01/24/2013
Views: 9032
|
|
|
dsc09039
Port side done after cure.
Date: 01/23/2013
Views: 9428
|
|
|
nex_2014_01_12_07
Port side.
Date: 01/13/2014
Views: 8157
|
|
|
dsc08626
Put in a 2x4 in the main wing spar tunnel and located the pins. This was only used to aid in keeping the plane from tipping.
Date: 04/14/2012
Views: 12624
|
|
|
nex_2013_08_24_04
As you see here the port side is done with rib 3 and 4. I didn't have photos of doing the layups.
Date: 08/25/2013
Views: 8161
|
|
|
nex_2014_01_25_28
Wings on. Not really required at the stage. Just had to do it for motivation.
Date: 01/26/2014
Views: 8640
|
|
|
dsc08640
OK not the best shot but here you can see I used the jack to move the rear rib in place under the airframe being careful not to pinch the belly. I then secured the rib in place but using some drywall screws in the 2x6. This way any weight will be transf
Date: 04/15/2012
Views: 9132
|
|
|
dsc08627
The monowheel landing gear is in the up position and resting on the main wheel with some of the weight held by the block and tackle. This was taken just before putting on the braces to keep her from rolling. Been trying to get rid of that tv in the back
Date: 04/14/2012
Views: 11801
|
|
|
nex_2014_01_25_04
Bill helping hoist the aircraft up to remove the jig.
Date: 01/25/2014
Views: 8443
|
|
|
nex_2014_01_25_01
Starboard side after Uni over ribs 3 and 4. Added Bid on the X to reinforce the cuts needed to get the Uni to lay flat. Also filled in Rib 1 air buble.
Date: 01/25/2014
Views: 8136
|
|
|
20141102_153539
Out. Ad you can see the screw is sill in the nut plate. it came out later.
Date: 11/02/2014
Views: 19373
|
|
|
dsc08628
Nic pic of the plane! If Bill would move his head out of the way! Notice I'm using a bungee cord to hold the doors open.
Date: 04/14/2012
Views: 9734
|
|
|
dsc09065
Stbd side peel ply removed.
Date: 01/25/2013
Views: 9584
|
|
|
nex_2014_01_25_31
Starboard side, need to trim the bolt.
Date: 01/26/2014
Views: 9366
|
|
|
nex_2013_08_24_03
nex_2013_08_24_03.jpg
Date: 08/25/2013
Views: 7837
|
|
|
dsc08635
Other view of the ribs.
Date: 04/15/2012
Views: 8361
|
|
|
nex_2013_08_24_01
Stb. side ribs 3 and 4 epibond in place with the 3 layups on all sides. At this point I was getting faster at doing layups however I only did one side at a time.
Date: 08/25/2013
Views: 8359
|
|
|
dsc08637
The mono wheel has been removed. Sad to see never used parts coming off the plane.
Date: 04/15/2012
Views: 8355
|
|
|
dsc08607
Starting to prep the bays for the tri-gear conversion.
Date: 04/10/2012
Views: 10643
|
|