|
dsc09061
Applying the layups on stbd side.
Date: 01/24/2013
Views: 7621
|
|
|
dsc08967
Little clean up required on Port side.
Date: 10/01/2012
Views: 9136
|
|
|
p1000727
p1000727.jpg
Date: 03/12/2012
Views: 6028
|
|
|
p1000615
p1000615.jpg
Date: 01/29/2012
Views: 9260
|
|
|
dsc09057
Wetting out stbd side.
Date: 01/24/2013
Views: 7509
|
|
|
nex_2014_01_12_01
Bolt hole for LG port side filed to size.
Date: 01/13/2014
Views: 6555
|
|
|
dsc08628
Nic pic of the plane! If Bill would move his head out of the way! Notice I'm using a bungee cord to hold the doors open.
Date: 04/14/2012
Views: 7905
|
|
|
20141102_154504
Cut old fuel lines. Gona have to replace them anyways. Now I just need to remove the stop block where the gear handle went.
Date: 11/02/2014
Views: 15167
|
|
|
p1000616
p1000616.jpg
Date: 01/29/2012
Views: 9151
|
|
|
p1000695
p1000695.jpg
Date: 03/12/2012
Views: 5740
|
|
|
p1000631
p1000631.jpg
Date: 02/14/2012
Views: 6927
|
|
|
dsc09044
Port side being keyed.
Date: 01/23/2013
Views: 7279
|
|
|
DSC08800
starboard side
Date: 06/05/2012
Views: 9056
|
|
|
p1000637
p1000637.jpg
Date: 02/14/2012
Views: 6234
|
|
|
dsc08965
Port side after layups and peel ply removed. Notice shape of hole for the angle of the LG socket. I wrapped the LG socket with sandpaper and used it to form the hole.
Date: 10/01/2012
Views: 9273
|
|
|
dsc09019
Trash can is the best way to hold the landing gear legs.
Date: 01/10/2013
Views: 7654
|
|
|
dsc08662
The 10“ diameter from the pilot hole.
Date: 04/22/2012
Views: 11784
|
|
|
dsc09023
Ensure you have a good key. I used the drill press to create the dimples. These will be filled with 420 and flox when doing the glass layups.
Date: 01/22/2013
Views: 7847
|
|
|
dsc08616
Same here, rust needs to go! Open to ideas.....
Date: 04/10/2012
Views: 6571
|
|
|
dsc08961
Stb side two layers bid 10" and 8" peel ply removed
Date: 10/01/2012
Views: 10840
|
|