|
dsc08966
Port side LG socket hole.
Date: 10/01/2012
Views: 11523
|
|
|
dsc09076
Bottom layup of the port side.
Date: 01/26/2013
Views: 9225
|
|
|
dsc09049
Layup Port side complete with peel ply. Notice the glad wrap to keep air from getting under the peel ply. 420 = 46g, aeropoxy ~ 200g
Date: 01/24/2013
Views: 9474
|
|
|
nex_2014_01_25_17
Rolled out on the grass. Notice the tail wheel is still there. I left it in due to not having the stacks of cash to hold the nose down.
Date: 01/26/2014
Views: 8615
|
|
|
nex_2014_01_25_31
Starboard side, need to trim the bolt.
Date: 01/26/2014
Views: 9374
|
|
|
dsc09073
Rib 2 template.
Date: 01/26/2013
Views: 9388
|
|
|
dsc09070
While the layups are curing we stared work on the axles. Had to ream out the holes forMG02.
Date: 01/25/2013
Views: 9201
|
|
|
dsc08627
The monowheel landing gear is in the up position and resting on the main wheel with some of the weight held by the block and tackle. This was taken just before putting on the braces to keep her from rolling. Been trying to get rid of that tv in the back
Date: 04/14/2012
Views: 11812
|
|
|
dsc09038
To make our backs happy and life 1000% easier we tilted the fuselage. Notice I used my monowheel trailer as a jig. A tow strap 4" wide was used in the rear to hold the tail. This was rock solid.
Date: 01/23/2013
Views: 9893
|
|
|
dsc09068
Seeing how ribs 2,3,4 line up. Get a belt sander 4x36, you'll be glad you did. Mine is from Harbor Freight.
Date: 01/25/2013
Views: 10189
|
|
|
nex_2014_01_25_16
nex_2014_01_25_16.jpg
Date: 01/25/2014
Views: 8379
|
|
|
dsc08621
Removal of the brake master for the mono.
Date: 04/14/2012
Views: 19285
|
|
|
dsc08664
The gell coat really gums up the sand paper. Still a bit more to remove.
Date: 04/22/2012
Views: 14342
|
|
|
nex_2014_01_25_07
What a mess.
Date: 01/25/2014
Views: 8415
|
|
|
dsc09055
Wetting out stbd side.
Date: 01/24/2013
Views: 8934
|
|
|
nex_2014_01_12_04
Port LG in place with bolt in.
Date: 01/13/2014
Views: 7953
|
|
|
dsc09033
Port side done.
Date: 01/22/2013
Views: 8885
|
|
|
dsc09032
Port side done.
Date: 01/22/2013
Views: 8739
|
|
|
dsc09056
Wetting out stbd side.
Date: 01/24/2013
Views: 8713
|
|
|
dsc09054
Wetting out stbd side.
Date: 01/24/2013
Views: 8743
|
|