Date: 12/31/1969 Views: 2508
Date: 04/21/2004 Views: 2887
Date: 05/08/2013 Views: 4337
Date: 08/23/2023 Views: 161272
While clamped, three holes were drilled for retainer hardware. One hole in the landing gear handle recess and two holes in the panel lower flange on the starboard side. The upper flange was marked for trim while the panel was clamped.