|
dsc08617
After removing the green tape.
Date: 04/14/2012
Views: 67727
|
|
|
dsc09030
Starboard side done.
Date: 01/22/2013
Views: 8712
|
|
|
dsc09048
Template for the Stbd side. Note, you are not required per the manual to hook over the plywood with bid.
Date: 01/24/2013
Views: 8476
|
|
|
dsc09060
Wetting out stbd side.
Date: 01/24/2013
Views: 8514
|
|
|
dsc09075
Stbd side after cure. We died the uni in with rib 1.
Date: 01/26/2013
Views: 8721
|
|
|
DSC08797
Port side
Date: 06/05/2012
Views: 9868
|
|
|
dsc08635
Other view of the ribs.
Date: 04/15/2012
Views: 7665
|
|
|
dsc08661
Locating the center of the main gear hole. Used a pilot to be used to measure out the 10“ diameter on the bottom.
Date: 04/22/2012
Views: 12087
|
|
|
nex_2014_01_12_04
Port LG in place with bolt in.
Date: 01/13/2014
Views: 7260
|
|
|
dsc08965
Port side after layups and peel ply removed. Notice shape of hole for the angle of the LG socket. I wrapped the LG socket with sandpaper and used it to form the hole.
Date: 10/01/2012
Views: 10120
|
|
|
dsc09069
Rib 2 stbd side.
Date: 01/25/2013
Views: 8998
|
|
|
dsc08630
Though this was a neat pic of the mono wheel in the retracted position.
Date: 04/14/2012
Views: 7433
|
|
|
photo (2)
Small area to work in. Back was killing me after that job. can't wait to give my back the same treatment when doing the ribs and starboard side.
Date: 08/20/2012
Views: 13496
|
|
|
dsc09023
Ensure you have a good key. I used the drill press to create the dimples. These will be filled with 420 and flox when doing the glass layups.
Date: 01/22/2013
Views: 8738
|
|
|
dsc09018
Started to make the axle jig. Used a simple setup of first taking large flat blocks of wood and caulking it to the floor somewhere over FS70. Then that allows me to fix the aluminum angle with a single screw once in its final position.
Date: 01/10/2013
Views: 9779
|
|
|
nex_2014_01_25_31
Starboard side, need to trim the bolt.
Date: 01/26/2014
Views: 8489
|
|
|
dsc08625
Cutting out one of the ribs for the airframe. Going to use the mono trailer as the foundation of the jig. This will make is easy to level the airframe when getting ready for the trr-gear conversion. How do you like my work bench?
Date: 04/14/2012
Views: 11817
|
|
|
dsc09054
Wetting out stbd side.
Date: 01/24/2013
Views: 8086
|
|
|
dsc08639
More of the same. I was going to cut the carpet and form it to the ribs and staple it in place but decided that was just a time vampire and pointless since the airframe is holding it in place.
Date: 04/15/2012
Views: 8196
|
|
|
nex_2014_01_12_05
Port side top.
Date: 01/13/2014
Views: 7378
|
|