|
p1000693
p1000693.jpg
Date: 03/12/2012
Views: 6781
|
|
|
dsc08635
Other view of the ribs.
Date: 04/15/2012
Views: 8369
|
|
|
dsc08619
Roap tied to the engine mount frame to hoist the airframe.
Date: 04/14/2012
Views: 17542
|
|
|
nex_2014_01_25_15
Doing mod 59.
Date: 01/25/2014
Views: 8034
|
|
|
20160403_160443.jpg
20160403_160443.jpg
Date: 04/03/2016
Views: 14344
|
|
|
dsc09073
Rib 2 template.
Date: 01/26/2013
Views: 9389
|
|
|
20160403_160502.jpg
20160403_160502.jpg
Date: 04/03/2016
Views: 13635
|
|
|
p1000687
p1000687.jpg
Date: 03/12/2012
Views: 6985
|
|
|
dsc09032
Port side done.
Date: 01/22/2013
Views: 8747
|
|
|
dsc09050
Stbd. side ready for the bid.
Date: 01/24/2013
Views: 8727
|
|
|
dsc09041
Port side guides being placed for layup.
Date: 01/23/2013
Views: 9433
|
|
|
dsc09070
While the layups are curing we stared work on the axles. Had to ream out the holes forMG02.
Date: 01/25/2013
Views: 9204
|
|
|
dsc09035
Rib one after cure of 420 and peel ply removed. Think we used 112g of 420 here due to the odd angle.
Date: 01/23/2013
Views: 8660
|
|
|
nex_2014_01_25_01
Starboard side after Uni over ribs 3 and 4. Added Bid on the X to reinforce the cuts needed to get the Uni to lay flat. Also filled in Rib 1 air buble.
Date: 01/25/2014
Views: 8145
|
|
|
20141102_153539
Out. Ad you can see the screw is sill in the nut plate. it came out later.
Date: 11/02/2014
Views: 19405
|
|
|
nex_2013_08_24_02
nex_2013_08_24_02.jpg
Date: 08/25/2013
Views: 7975
|
|
|
p1000711
p1000711.jpg
Date: 03/12/2012
Views: 6724
|
|
|
p1000702
p1000702.jpg
Date: 03/12/2012
Views: 6115
|
|
|
dsc08960
Stb side after layups and peel ply removed.
Date: 10/01/2012
Views: 12552
|
|
|
dsc08603
Since I'm going to have to remove the mono wheel I dont have much of an edge to close in the big hole in the bottom. I'll have a better look at it once its a tri-gear.
Date: 04/10/2012
Views: 12302
|
|