|
dsc08610
Whats missing?
Date: 04/10/2012
Views: 8614
|
|
|
p1000615
p1000615.jpg
Date: 01/29/2012
Views: 9586
|
|
|
20141102_161049
20141102_161049.jpg
Date: 11/02/2014
Views: 13905
|
|
|
dsc09038
To make our backs happy and life 1000% easier we tilted the fuselage. Notice I used my monowheel trailer as a jig. A tow strap 4" wide was used in the rear to hold the tail. This was rock solid.
Date: 01/23/2013
Views: 8691
|
|
|
p1000694
p1000694.jpg
Date: 03/12/2012
Views: 6623
|
|
|
dsc09070
While the layups are curing we stared work on the axles. Had to ream out the holes forMG02.
Date: 01/25/2013
Views: 8117
|
|
|
dsc09023
Ensure you have a good key. I used the drill press to create the dimples. These will be filled with 420 and flox when doing the glass layups.
Date: 01/22/2013
Views: 8332
|
|
|
dsc08638
I used some thick good quality carpet to pad the ribs.
Date: 04/15/2012
Views: 7508
|
|
|
dsc09020
Bill helping by putting a good key on the sockets.
Date: 01/22/2013
Views: 7914
|
|
|
dsc08662
The 10“ diameter from the pilot hole.
Date: 04/22/2012
Views: 12257
|
|
|
dsc08628
Nic pic of the plane! If Bill would move his head out of the way! Notice I'm using a bungee cord to hold the doors open.
Date: 04/14/2012
Views: 8510
|
|
|
dsc09054
Wetting out stbd side.
Date: 01/24/2013
Views: 7671
|
|
|
p1000720
p1000720.jpg
Date: 03/12/2012
Views: 6898
|
|
|
dsc08642
From the start the airframe was sitting 2.5 deg tail low and 0.1 deg to port. Not bad for just putting her on there. I jacked up the back of the trailer to get it as near to 0.0 as possible and also shifted the airframe latterly to turn that .1 to 0.0 a
Date: 04/15/2012
Views: 11001
|
|
|
dsc09073
Rib 2 template.
Date: 01/26/2013
Views: 8337
|
|
|
DSC08796
Put in the panel to dream a little. Don't really know what I'm going to do. Was thinking of keeping it low cost for the first panel and keeping it analog until I can get the cash mula for something better like glass/IFR. Also want to fill the hole where
Date: 06/05/2012
Views: 11748
|
|
|
dsc09064
Bill does nice peel ply work!
Date: 01/24/2013
Views: 8101
|
|
|
dsc09021
BIG THANK YOU to my Uncle Kim Prout for flying out to help me with getting the gear legs set. He also helped me slow down and plan ahead. As an excited new builder its easy to get in a rush to try achieve something tangible. Im sure after that week of b
Date: 01/22/2013
Views: 8343
|
|
|
p1000728
p1000728.jpg
Date: 03/12/2012
Views: 6312
|
|
|
dsc08606
Old mass balance arm.
Date: 04/10/2012
Views: 9716
|
|