|
nex_2014_01_12_02
Rat's tail rasp works great here.
Date: 01/13/2014
Views: 7401
|
|
|
dsc09070
While the layups are curing we stared work on the axles. Had to ream out the holes forMG02.
Date: 01/25/2013
Views: 8550
|
|
|
dsc09040
The gap from the bottom of the socket and the belly is as you see. The only way to get it all the way down was to lower the belly to 15" which was not considered an option. Belly hight is 16.0" with the axle width at 82.50" and axle cent
Date: 01/23/2013
Views: 9542
|
|
|
dsc09068
Seeing how ribs 2,3,4 line up. Get a belt sander 4x36, you'll be glad you did. Mine is from Harbor Freight.
Date: 01/25/2013
Views: 9606
|
|
|
dsc08960
Stb side after layups and peel ply removed.
Date: 10/01/2012
Views: 11935
|
|
|
dsc08664
The gell coat really gums up the sand paper. Still a bit more to remove.
Date: 04/22/2012
Views: 13648
|
|
|
nex_2014_01_25_06
Mains on the ground for the first time.
Date: 01/25/2014
Views: 7617
|
|
|
dsc09072
Here is a shot of the working angle. This was so much better than leaning over the edge. Kim's idea. Notice the heater behind Kim, this was key to keeping the temps even though the temps outside were in the 40's.
Date: 01/26/2013
Views: 8718
|
|
|
dsc08963
Port side. LG socket fitting.
Date: 10/01/2012
Views: 9888
|
|
|
nex_2014_01_25_28
Wings on. Not really required at the stage. Just had to do it for motivation.
Date: 01/26/2014
Views: 7893
|
|
|
dsc08623
bungee cord removal.
Date: 04/14/2012
Views: 18392
|
|
|
dsc09058
Wetting out stbd side.
Date: 01/24/2013
Views: 8176
|
|
|
dsc09060
Wetting out stbd side.
Date: 01/24/2013
Views: 8562
|
|
|
nex_2014_01_12_05
Port side top.
Date: 01/13/2014
Views: 7442
|
|
|
nex_2014_01_25_02
Starboard side of the air bubble fix on rib one. Used Flox with aeroboxy as a fillit.
Date: 01/25/2014
Views: 7676
|
|
|
dsc09057
Wetting out stbd side.
Date: 01/24/2013
Views: 8343
|
|
|
dsc09021
BIG THANK YOU to my Uncle Kim Prout for flying out to help me with getting the gear legs set. He also helped me slow down and plan ahead. As an excited new builder its easy to get in a rush to try achieve something tangible. Im sure after that week of b
Date: 01/22/2013
Views: 8784
|
|
|
dsc09030
Starboard side done.
Date: 01/22/2013
Views: 8773
|
|
|
dsc08629
In a few mins she will no longer be a monowheel :-(
Date: 04/14/2012
Views: 8495
|
|
|
dsc08602
Landing gear parts. The nose gear leg is having MOD 53 performed on it at my fauther in-laws.
Date: 04/10/2012
Views: 9353
|
|