|
dsc08640
OK not the best shot but here you can see I used the jack to move the rear rib in place under the airframe being careful not to pinch the belly. I then secured the rib in place but using some drywall screws in the 2x6. This way any weight will be transf
Date: 04/15/2012
Views: 8970
|
|
|
nex_2014_01_25_06
Mains on the ground for the first time.
Date: 01/25/2014
Views: 8065
|
|
|
dsc09054
Wetting out stbd side.
Date: 01/24/2013
Views: 8572
|
|
|
dsc08629
In a few mins she will no longer be a monowheel :-(
Date: 04/14/2012
Views: 9005
|
|
|
dsc09068
Seeing how ribs 2,3,4 line up. Get a belt sander 4x36, you'll be glad you did. Mine is from Harbor Freight.
Date: 01/25/2013
Views: 10025
|
|
|
dsc09063
Hey Bill!
Date: 01/24/2013
Views: 8853
|
|
|
nex_2014_01_12_01
Bolt hole for LG port side filed to size.
Date: 01/13/2014
Views: 7799
|
|
|
nex_2014_01_25_31
Starboard side, need to trim the bolt.
Date: 01/26/2014
Views: 9173
|
|
|
DSC08800
starboard side
Date: 06/05/2012
Views: 10336
|
|
|
dsc09065
Stbd side peel ply removed.
Date: 01/25/2013
Views: 9423
|
|
|
dsc09036
Rib one port side again used around 112g of 420 cured at 78f for 12 hours.
Date: 01/23/2013
Views: 8938
|
|
|
dsc09040
The gap from the bottom of the socket and the belly is as you see. The only way to get it all the way down was to lower the belly to 15" which was not considered an option. Belly hight is 16.0" with the axle width at 82.50" and axle cent
Date: 01/23/2013
Views: 10063
|
|
|
dsc08621
Removal of the brake master for the mono.
Date: 04/14/2012
Views: 19024
|
|
|
nex_2014_01_25_07
What a mess.
Date: 01/25/2014
Views: 8243
|
|
|
nex_2013_08_24_06
Time for some clean up.
Date: 08/25/2013
Views: 8065
|
|
|
20141102_153539
Out. Ad you can see the screw is sill in the nut plate. it came out later.
Date: 11/02/2014
Views: 19151
|
|
|
dsc08966
Port side LG socket hole.
Date: 10/01/2012
Views: 11357
|
|
|
dsc08965
Port side after layups and peel ply removed. Notice shape of hole for the angle of the LG socket. I wrapped the LG socket with sandpaper and used it to form the hole.
Date: 10/01/2012
Views: 10667
|
|
|
20141102_152814
Drilling out the screw. It would move. I'm removing this plate to patch later.
Date: 11/02/2014
Views: 12020
|
|
|
dsc09046
Making a layup schedule for rib 1.
Date: 01/23/2013
Views: 9163
|
|