|
dsc09064
Bill does nice peel ply work!
Date: 01/24/2013
Views: 8239
|
|
|
dsc08662
The 10“ diameter from the pilot hole.
Date: 04/22/2012
Views: 12394
|
|
|
dsc09021
BIG THANK YOU to my Uncle Kim Prout for flying out to help me with getting the gear legs set. He also helped me slow down and plan ahead. As an excited new builder its easy to get in a rush to try achieve something tangible. Im sure after that week of b
Date: 01/22/2013
Views: 8471
|
|
|
dsc09061
Applying the layups on stbd side.
Date: 01/24/2013
Views: 8159
|
|
|
dsc08964
Port side. Fitting of LG socket.
Date: 10/01/2012
Views: 9325
|
|
|
dsc08621
Removal of the brake master for the mono.
Date: 04/14/2012
Views: 17304
|
|
|
nex_2014_01_25_03
Port side dirty work. Just test fitting final install with all hardware will be after the legs are painted.
Date: 01/25/2014
Views: 7509
|
|
|
dsc09046
Making a layup schedule for rib 1.
Date: 01/23/2013
Views: 8391
|
|
|
dsc09060
Wetting out stbd side.
Date: 01/24/2013
Views: 8274
|
|
|
dsc08664
The gell coat really gums up the sand paper. Still a bit more to remove.
Date: 04/22/2012
Views: 13334
|
|
|
dsc09070
While the layups are curing we stared work on the axles. Had to ream out the holes forMG02.
Date: 01/25/2013
Views: 8249
|
|
|
dsc09023
Ensure you have a good key. I used the drill press to create the dimples. These will be filled with 420 and flox when doing the glass layups.
Date: 01/22/2013
Views: 8463
|
|
|
dsc09058
Wetting out stbd side.
Date: 01/24/2013
Views: 7871
|
|
|
dsc08607
Starting to prep the bays for the tri-gear conversion.
Date: 04/10/2012
Views: 9594
|
|
|
20141102_162118
Cut it out.
Date: 11/02/2014
Views: 68526
|
|
|
dsc09057
Wetting out stbd side.
Date: 01/24/2013
Views: 8038
|
|
|
nex_2013_08_24_02
nex_2013_08_24_02.jpg
Date: 08/25/2013
Views: 6975
|
|
|
20141102_161049
20141102_161049.jpg
Date: 11/02/2014
Views: 14213
|
|
|
nex_2013_08_24_01
Stb. side ribs 3 and 4 epibond in place with the 3 layups on all sides. At this point I was getting faster at doing layups however I only did one side at a time.
Date: 08/25/2013
Views: 7437
|
|
|
dsc09047
I took cardboard and bent it around the socket and overlapped per the manual. Then took this cardboard and made a new template for cutouts. This made the layups go really quick.
Date: 01/23/2013
Views: 8447
|
|