|
IMG_0189[1]
Date: 04/13/2014
Views: 13240
|
|
|
IMG_0229
At Steve's workshop packing the kit ready for transportation
Date: 01/31/2014
Views: 10189
|
|
|
IMG_0404
Date: 04/17/2015
Views: 10604
|
|
|
IMG_0251
Kit safely in Storage.
Date: 02/01/2014
Views: 10101
|
|
|
Ipad 041
Shed Under construction
Date: 03/27/2014
Views: 9698
|
|
|
IMG_0191[1]
Date: 09/12/2015
Views: 10027
|
|
|
Rivets
Next problem. Once the push rod end was fitted and drilled according to the manual the rivets provided were too short to go through the whole structure. Awaiting a response from Europa
Date: 09/03/2015
Views: 10033
|
|
|
IMG_0394
Date: 04/10/2015
Views: 9373
|
|
|
IMG_0389
Rear Bulk head fixed and peel plyed
Date: 04/10/2015
Views: 9144
|
|
|
IMG_0235
Date: 02/01/2014
Views: 10106
|
|
|
IMG_0823
Same of port side.
Date: 09/03/2015
Views: 8464
|
|
|
IMG_0409
Date: 04/17/2015
Views: 9352
|
|
|
DSC00212
Marking position for bracket on rear bulk head
Date: 09/08/2015
Views: 14968
|
|
|
Torque tube
Took some measurements and sent query to Europa. Response was I required the issue 1 TP38s
Date: 09/03/2015
Views: 6226
|
|
|
DSC00165
Trial fit of the push rod bracket! Doesn't look good. This is going to take some thought.
Date: 09/04/2015
Views: 14988
|
|
|
IMG_0400
Date: 04/14/2015
Views: 10088
|
|
|
IMG_0392
Date: 04/10/2015
Views: 9053
|
|
|
IMG_0406
Date: 04/17/2015
Views: 9744
|
|
|
IMG_0187.JPG (2)
Workshop kitted out. All done in 3 weeks!
Date: 04/13/2014
Views: 12027
|
|
|
IMG_0279
Insulation going in
Date: 04/02/2014
Views: 11661
|
|