|
nex_2014_01_12_01
Bolt hole for LG port side filed to size.
Date: 01/13/2014
Views: 7962
|
|
|
dsc08622
Removed.
Date: 04/14/2012
Views: 18862
|
|
|
nex_2014_01_12_05
Port side top.
Date: 01/13/2014
Views: 8110
|
|
|
dsc09023
Ensure you have a good key. I used the drill press to create the dimples. These will be filled with 420 and flox when doing the glass layups.
Date: 01/22/2013
Views: 9535
|
|
|
dsc09020
Bill helping by putting a good key on the sockets.
Date: 01/22/2013
Views: 9067
|
|
|
dsc08621
Removal of the brake master for the mono.
Date: 04/14/2012
Views: 19266
|
|
|
dsc08642
From the start the airframe was sitting 2.5 deg tail low and 0.1 deg to port. Not bad for just putting her on there. I jacked up the back of the trailer to get it as near to 0.0 as possible and also shifted the airframe latterly to turn that .1 to 0.0 a
Date: 04/15/2012
Views: 12290
|
|
|
nex_2013_08_24_01
Stb. side ribs 3 and 4 epibond in place with the 3 layups on all sides. At this point I was getting faster at doing layups however I only did one side at a time.
Date: 08/25/2013
Views: 8358
|
|
|
nex_2014_01_25_17
Rolled out on the grass. Notice the tail wheel is still there. I left it in due to not having the stacks of cash to hold the nose down.
Date: 01/26/2014
Views: 8604
|
|
|
dsc08627
The monowheel landing gear is in the up position and resting on the main wheel with some of the weight held by the block and tackle. This was taken just before putting on the braces to keep her from rolling. Been trying to get rid of that tv in the back
Date: 04/14/2012
Views: 11800
|
|
|
dsc09046
Making a layup schedule for rib 1.
Date: 01/23/2013
Views: 9338
|
|
|
dsc09048
Template for the Stbd side. Note, you are not required per the manual to hook over the plywood with bid.
Date: 01/24/2013
Views: 9215
|
|
|
dsc08637
The mono wheel has been removed. Sad to see never used parts coming off the plane.
Date: 04/15/2012
Views: 8354
|
|
|
nex_2014_01_25_07
What a mess.
Date: 01/25/2014
Views: 8411
|
|
|
dsc09032
Port side done.
Date: 01/22/2013
Views: 8732
|
|
|
dsc08641
Was going to use another plywood rib here but decided that the wide strap works fine. I later added some foam to the strap to give it some padding.
Date: 04/15/2012
Views: 9600
|
|
|
nex_2013_08_24_04
As you see here the port side is done with rib 3 and 4. I didn't have photos of doing the layups.
Date: 08/25/2013
Views: 8160
|
|
|
dsc09037
Making a template for rib 2. Do yourself a favor and do not use the templates in the manual you will end up waisting your plywood, just make your own.
Date: 01/23/2013
Views: 9500
|
|
|
dsc09054
Wetting out stbd side.
Date: 01/24/2013
Views: 8738
|
|
|
dsc09065
Stbd side peel ply removed.
Date: 01/25/2013
Views: 9584
|
|