dsc09044
Port side being keyed.
Date: 01/23/2013
Views: 8743
|
|
|
nex_2014_01_12_04
Port LG in place with bolt in.
Date: 01/13/2014
Views: 7939
|
|
|
dsc08661
Locating the center of the main gear hole. Used a pilot to be used to measure out the 10“ diameter on the bottom.
Date: 04/22/2012
Views: 12926
|
|
|
nex_2014_01_25_28
Wings on. Not really required at the stage. Just had to do it for motivation.
Date: 01/26/2014
Views: 8624
|
|
|
nex_2014_01_12_01
Bolt hole for LG port side filed to size.
Date: 01/13/2014
Views: 7956
|
|
|
dsc08961
Stb side two layers bid 10" and 8" peel ply removed
Date: 10/01/2012
Views: 12341
|
|
|
dsc09058
Wetting out stbd side.
Date: 01/24/2013
Views: 8696
|
|
|
dsc08617
After removing the green tape.
Date: 04/14/2012
Views: 73147
|
|
|
dsc08638
I used some thick good quality carpet to pad the ribs.
Date: 04/15/2012
Views: 8579
|
|
|
dsc08629
In a few mins she will no longer be a monowheel :-(
Date: 04/14/2012
Views: 9163
|
|
|
dsc09052
Wetting out stbd side.
Date: 01/24/2013
Views: 9488
|
|
|
dsc09073
Rib 2 template.
Date: 01/26/2013
Views: 9383
|
|
|
dsc09055
Wetting out stbd side.
Date: 01/24/2013
Views: 8925
|
|
|
2012-08-18_19-58-15_689
Port side. Red highlighted area shows area with little reinforcement on inside. This is before I did the belly layup per the manual.
Date: 08/19/2012
Views: 11745
|
|
|
nex_2014_01_25_31
Starboard side, need to trim the bolt.
Date: 01/26/2014
Views: 9353
|
|
|
nex_2014_01_25_04
Bill helping hoist the aircraft up to remove the jig.
Date: 01/25/2014
Views: 8435
|
|
|
dsc08635
Other view of the ribs.
Date: 04/15/2012
Views: 8354
|
|
|
dsc08618
Block and tackle used to hoist the front of the aircraft to aid in creating a jig. This hoist reduces the weight to 25%.
Date: 04/14/2012
Views: 17082
|
|
|
nex_2014_01_25_03
Port side dirty work. Just test fitting final install with all hardware will be after the legs are painted.
Date: 01/25/2014
Views: 8430
|
|
|
dsc09042
Starboard side being keyed.
Date: 01/23/2013
Views: 8523
|
|