|
dsc08662
The 10“ diameter from the pilot hole.
Date: 04/22/2012
Views: 13406
|
|
|
dsc09047
I took cardboard and bent it around the socket and overlapped per the manual. Then took this cardboard and made a new template for cutouts. This made the layups go really quick.
Date: 01/23/2013
Views: 9413
|
|
|
20141102_161049
20141102_161049.jpg
Date: 11/02/2014
Views: 15859
|
|
|
dsc08621
Removal of the brake master for the mono.
Date: 04/14/2012
Views: 19286
|
|
|
dsc08635
Other view of the ribs.
Date: 04/15/2012
Views: 8366
|
|
|
p1000693
p1000693.jpg
Date: 03/12/2012
Views: 6781
|
|
|
p1000633
p1000633.jpg
Date: 02/14/2012
Views: 7095
|
|
|
20160403_160443.jpg
20160403_160443.jpg
Date: 04/03/2016
Views: 14333
|
|
|
p1000710
p1000710.jpg
Date: 03/12/2012
Views: 6399
|
|
|
p1000690
p1000690.jpg
Date: 03/12/2012
Views: 6564
|
|
|
p1000470
p1000470.jpg
Date: 12/09/2011
Views: 11995
|
|
|
dsc09023
Ensure you have a good key. I used the drill press to create the dimples. These will be filled with 420 and flox when doing the glass layups.
Date: 01/22/2013
Views: 9556
|
|
|
nex_2014_01_25_06
Mains on the ground for the first time.
Date: 01/25/2014
Views: 8240
|
|
|
nex_2013_08_24_01
Stb. side ribs 3 and 4 epibond in place with the 3 layups on all sides. At this point I was getting faster at doing layups however I only did one side at a time.
Date: 08/25/2013
Views: 8365
|
|
|
me_europa
Me in front of my Uncles Europa Classic late 90's in Borrego Springs, CA.
Date: 05/22/2012
Views: 11358
|
|
|
dsc08661
Locating the center of the main gear hole. Used a pilot to be used to measure out the 10“ diameter on the bottom.
Date: 04/22/2012
Views: 12941
|
|
|
p1000727
p1000727.jpg
Date: 03/12/2012
Views: 6439
|
|
|
dsc08640
OK not the best shot but here you can see I used the jack to move the rear rib in place under the airframe being careful not to pinch the belly. I then secured the rib in place but using some drywall screws in the 2x6. This way any weight will be transf
Date: 04/15/2012
Views: 9143
|
|
|
dsc09046
Making a layup schedule for rib 1.
Date: 01/23/2013
Views: 9349
|
|
|
E1
[quote="Bud Yerly"]"Make a glass cover that fits the hole out of three sheets of bid laid up on a flat surface. After cure, hold it up to the bottom of the plane and mark the contour. Cut and approximate the fit. It should be near level
Date: 10/05/2012
Views: 12047
|
|