|
dsc08400
Very hard to work in the tunnel and I'm a small guy, 5'11“ 150#
Date: 03/25/2012
Views: 9161
|
|
|
dsc08965
Port side after layups and peel ply removed. Notice shape of hole for the angle of the LG socket. I wrapped the LG socket with sandpaper and used it to form the hole.
Date: 10/01/2012
Views: 10156
|
|
|
dsc08605
When I received the plane it had a few areas of this green tape. I guess it was going to be used as a release agent for some sort of jig fabrication. I have found that this 3M stuff works very well.
Date: 04/10/2012
Views: 11993
|
|
|
nex_2014_01_25_15
Doing mod 59.
Date: 01/25/2014
Views: 7392
|
|
|
p1000476
p1000476.jpg
Date: 12/13/2011
Views: 13310
|
|
|
p1000715
p1000715.jpg
Date: 03/12/2012
Views: 6719
|
|
|
dsc08638
I used some thick good quality carpet to pad the ribs.
Date: 04/15/2012
Views: 7931
|
|
|
dsc08963
Port side. LG socket fitting.
Date: 10/01/2012
Views: 9881
|
|
|
p1000705
p1000705.jpg
Date: 03/12/2012
Views: 6033
|
|
|
dsc09058
Wetting out stbd side.
Date: 01/24/2013
Views: 8163
|
|
|
dsc09056
Wetting out stbd side.
Date: 01/24/2013
Views: 8118
|
|
|
dsc09035
Rib one after cure of 420 and peel ply removed. Think we used 112g of 420 here due to the odd angle.
Date: 01/23/2013
Views: 7997
|
|
|
dsc09041
Port side guides being placed for layup.
Date: 01/23/2013
Views: 8828
|
|
|
dsc09062
Bill applying peel ply!
Date: 01/24/2013
Views: 8599
|
|
|
dsc09036
Rib one port side again used around 112g of 420 cured at 78f for 12 hours.
Date: 01/23/2013
Views: 8537
|
|
|
p1000693
p1000693.jpg
Date: 03/12/2012
Views: 6614
|
|
|
nex_2014_01_12_06
She's got a leg!
Date: 01/13/2014
Views: 7446
|
|
|
dsc09029
Gear legs clamped in place, no toe in/out per Bud. You cant see it in the photo but I used a green tip .30 bullet as a homemade plum bob that was attached to dead center of the aluminum angle. This helped us keep the guide over the center line. Oh make
Date: 01/22/2013
Views: 8722
|
|
|
dsc08961
Stb side two layers bid 10" and 8" peel ply removed
Date: 10/01/2012
Views: 11736
|
|
|
dsc09046
Making a layup schedule for rib 1.
Date: 01/23/2013
Views: 8675
|
|