Date: 11/26/2006 Views: 3433
Date: 12/31/1969 Views: 4425
Date: 11/01/2007 Views: 2577
Date: 08/23/2023 Views: 212114
Date: 05/23/2007 Views: 583760
Port side bonded in place after tapping aluminium ring, and inserting cut down, scuff sanded and wet out with Redux 4-40 100 degree flat head screws. Screw heads and edge of aluminium ring packed with Redux/flox.