Results of first pass of Port top wingskin bond on 2.
Date: 09/12/2010
Views: 7487
IMG_1753
Date: 07/18/2004
Views: 9628
Newest Image
EAA SITE
Date: 08/23/2023
Views: 838730
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 838730
Front HardPoint 1
Before removing glass and foam from the outboard side of the tunnel, Art bonded some 1.5" aluminium drill bushings in place with JB KWIK to 3M 375 packaging tape that was scuff sanded.
Ended up the tape was not quite as stuck to the tunnel as I would have liked, so put some dabs of JB on top and bottom of the drill bushings directly to the paint.