Login
EuropaOwners Recent Updates Upright reinforced joints 2 of 2.
Advanced Search
View Slideshow (Fullscreen)

Recent Updates

1. ALFRED... ... 375. Vertical... 376. Vertical... 377. Upright... 378. Upright... 379. The last... 380. Front... 381. Schottky... ... 400. Starboard...

Random Images

Port lift strut complete 2.

Port lift strut complete 2.

Date: 12/28/2009 Views: 5427

Fuel_system_16

Fuel_system_16

Date: 07/01/2007 Views: 5368

24_04_08_vliegfoto_s_071

24_04_08_vliegfoto_s_071

Date: 04/26/2008 Views: 3055

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 704539

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 704539

Upright reinforced joints 2 of 2.

2) Apply glue to the contact areas of these two 2 x 3 reinforcements.

4) Using four 3" Sheetrock screws each for each upright joint reinforcement drill 4 clearance holes. Two each side of the vertical uprights and two in each of the reinforcement 2 x 3s. Then drill pilot holes for the screws. It's best if you do only one at a time. Drill only one clearance and one pilot hole at a time, then install and tighten that screw, then go onto the next.

This exercise will reward you with strong and stiff uprights.

Once the glue is dried or cured, you can back off the pivot screws to the point that gravity will move the swing-arm.

Y11-09-17

Date: 08/12/2003
Size:
Full size: 4048x3040
nextlast
first previous
Upright reinforced joints 2 of 2.

Photo Properties

summary  details
Make FUJIFILM Model FinePix S7000
Aperture Value f/4 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 14 mm
ISO 200 Metering Mode Multi-Segment
Shutter Speed Value 1/240 sec Date/Time Tue 12 Aug 2003 05:40:14 PM UTC
nextlast
first previous
Powered by Gallery v2.3