|
|
Starboard extension last 2 BID internal lay-up
Date: 11/30/2013
Views: 9394
|
|
|
Reinforce gear tunnel front cable mount with aluminium
Date: 11/30/2013
Views: 6656
|
|
|
|
5.4 oz. for bracket, pillow block and pillow block mounting hardware
Date: 11/29/2013
Views: 8892
|
|
|
Oops, a few air bubles on aft mount reinforcemelay-up, drilled holes, filled with Aeropoxy, plugged with dry flox and Peel-Ply
Date: 11/30/2013
Views: 8423
|
|
|
|
Oops, fixed a dent I made with a C-Clamp when testing spar Adel clamp bracket, Q-Cel, 1 BID and Peel-Ply
Date: 11/30/2013
Views: 8503
|
|
|
Oops, several dents being repaired in Port seat base, Q-Cel, 1 BID, Peel-Ply
Date: 11/30/2013
Views: 9008
|
|
|
|
Made spacer a few thousands shorter than the pillow block hole
Date: 11/29/2013
Views: 7704
|
|
|
Ready for final assembly
Date: 11/29/2013
Views: 7129
|
|
|
|
New 1/4-28 nuts
Date: 11/29/2013
Views: 7854
|
|
|
3.2 oz. for aft bracket
Date: 11/29/2013
Views: 7535
|
|
|
|
Shot of 1/4" hardware spacers
Date: 11/29/2013
Views: 8933
|
|
|
Fred dolly 2
Date: 05/29/2013
Views: 11918
|
|
|
|
Fred dolly 1
Date: 05/29/2013
Views: 7039
|
|
|
Fred Klein outrigger 1
Date: 06/28/2013
Views: 15109
|
|
|
|
Fred Klein outrigger 2
Date: 07/01/2013
Views: 12553
|
|
|
Fred Klein outrigger eccentric
Date: 10/28/2013
Views: 11509
|
|
|
|
Series 6 cable specifications 2 of 2
Date: 11/28/2013
Views: 7475
|
|
|
Series 6 cable specifications 1 of 2
Date: 11/28/2013
Views: 6888
|
|
|
|
1 side Top Coated
Date: 11/28/2013
Views: 7128
|
|
|
Melted metal together (TIG), then Self Etch Primer
Date: 11/28/2013
Views: 7112
|
|