Login
EuropaOwners Most Viewed Items Port bottom strengthening.
Advanced Search
View Slideshow (Fullscreen)

Most Viewed Items

1. Mid panel... ... 76. Stick... 77. Vertex... 78. Lower port ... 79. Port bottom... 80. Panel... 81. Nice fit. 82. Cooling/dem... ... 84. Assortment ...

Random Images

DSCN5122

DSCN5122

Date: 11/29/1999 Views: 6177

Tool for removing Pip Pin 2.

Tool for removing Pip Pin 2.

Date: 10/16/2010 Views: 6703

fuel_6

fuel_6

Date: 12/31/1969 Views: 7055

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 725593

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 725593

Port bottom strengthening.

Flange was removed to allow module to fit on top of tunnel, and we also removed a portion of tunnel in module that was meant for sight gauge because we needed clearance for our pilot/co-pilot switch connections. Anyway this is where we want to mount port lower bracket that ties to firewall and it is just not strong enough. Resolution is a carbon fiber rod and a piece of 1/8plywood.
CF here floxed in place. Tip without wood will be 2 BID and the end with wood will also be 2 BID.
Y10-01-24

Date: 01/20/2010
Size:
Full size: 2592x1944
nextlast
first previous
Port bottom strengthening.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/4.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Thu 21 Jan 2010 01:17:13 AM UTC
nextlast
first previous
Powered by Gallery v2.3