Login
EuropaOwners Recent Updates Marked area to be cut out after stabalizing with 4 more rivets.
Advanced Search
View Slideshow (Fullscreen)

Recent Updates

1. Engine... ... 67. Population ... 68. No more... 69. No more... 70. Marked area... 71. First pass ... 72. Relieved... 73. Population ... ... 261. N4211W...

Random Images

DSCF0003

DSCF0003

Date: 01/26/2009 Views: 5524

IMG_5220

IMG_5220

Date: 12/29/2012 Views: 7891

IMG_0502

IMG_0502

Date: 10/13/2008 Views: 5209

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693403

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693403

Marked area to be cut out after stabalizing with 4 more rivets.

Reason for installing rivets and nutplates before cutting is on other two insert cutouts the layup done by Europa, (or their vendor) was not stuck very well and it easily delaminated. By installing rivets and nutplates first it helped preventing some of the delamination and stabilized what was delaminated. I did put a little resin in there first and tried to scuff, but it is of poor quality where layup went onto wood.
This lower port insert area appears to be bonded the best, (comparing to Port and Starboard larger insert areas) onto the wood insert. Alan used a Perma-Grit cutter on Dremil tool to make cuts quick and fairly precise.

Date: 07/19/2010
Size:
Full size: 2592x1944
nextlast
first previous
Marked area to be cut out after stabalizing with 4 more rivets.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Mon 19 Jul 2010 10:46:56 PM UTC
nextlast
first previous
Powered by Gallery v2.3