Login
EuropaOwners Random Items Port front spacer perfectly bonded in position.
Advanced Search
View Slideshow (Fullscreen)

Random Images

Wing Load Test 2

Wing Load Test 2

Date: 11/23/2010 Views: 4517

smDSCN2005

smDSCN2005

Date: 12/31/1969 Views: 5597

dscn0974

dscn0974

Date: 12/31/1999 Views: 4480

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 771465

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 771465

Port front spacer perfectly bonded in position.

Port front spacer perfectly bonded in position. Just need to remove double sticky tape.
Needed to Dremel out some areas of rebate, perhaps removed half of the fiberglass. Will strengthen with 2 BID from the bottom.
Used Dremel with both a Rotozip tool and long slender Tungsten Carbide grit to shape both port front and aft tang rebate area.
Y9-10-14

Date: 10/14/2009
Size:
Full size: 2592x1944
Port front spacer perfectly bonded in position.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/4.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Thu 15 Oct 2009 12:11:11 AM UTC
Powered by Gallery v2.3