Login
EuropaOwners Recent Updates Aft fuse conduit run 19.
Advanced Search
View Slideshow (Fullscreen)

Recent Updates

1. Required... ... 289. Aft fuse... 290. Aft fuse... 291. Aft fuse... 292. Aft fuse... 293. Aft fuse... 294. Port 50 pin... 295. Port 50 pin... ... 400. Front fuse ...

Random Images

Option A) Electrical Box install 2 of 2.

Option A) Electrical Box install 2 of 2.

Date: 08/12/2003 Views: 8594

081402_lowerflap_fairing

081402_lowerflap_fairing

Date: 12/31/1969 Views: 3978

Ultimate_ventilator_10

Ultimate_ventilator_10

Date: 07/02/2009 Views: 5143

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 704952

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 704952

Aft fuse conduit run 19.

This aft conduit was trimmed to proper length, scuff sanded, wet out with Redux. Redux/Flox applied. Then it was screwed in place.
Tape was left in place when conduit was being screwed, squeeze out was cleaned up and tape was removed.
Scuff sanding goes beyond conduit contact area in preparation for fill. Baggage bay bulkhead contact area was prepped prior to bonding on top fuse while it was easier to access. Now it will require only a light wake up sanding.
Y11-01-02
XS-FUN

Date: 01/02/2011
Size:
Full size: 2592x1944
nextlast
first previous
Aft fuse conduit run 19.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Sun 02 Jan 2011 02:51:29 AM UTC
nextlast
first previous
Powered by Gallery v2.3