Spar clamp that allows a little fore and aft movement
Date: 11/27/2013
Views: 9179
DSCF0635
Date: 07/28/2003
Views: 10344
41aileron_drive_jig
Date: 12/31/1969
Views: 3807
Newest Image
EAA SITE
Date: 08/23/2023
Views: 769574
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 769574
Option C) Electrical Box install 2 of 3.
If option C) was your Electrical Box choice, you wouldn't need the 1" Sheetrock screws shown in the photo (used to hold option B) battery in position).
You also wouldn't need the aft upright 2 x 3 to be so tall, or need a 15 degree (off 90 degree) cut on both 2 x 3 uprights. Both upright 2 x 3s only need to be cut 1" longer than the top of the 2 x 6 swing-arm, and only at a 90 degree angle.