Login
EuropaOwners Recent Updates Front Starboard fuse stiffening for lift socket 6.
Advanced Search
View Slideshow (Fullscreen)

Recent Updates

1. Spar ramp 9. ... 63. Smooth... 64. Getting... 65. Front... 66. Front... 67. Front... 68. Front... 69. Front... ... 190. Dan Bish's ...

Random Images

Gap fill 2.

Gap fill 2.

Date: 10/28/2009 Views: 5083

John and Fred Klein

John and Fred Klein

Date: 09/18/2010 Views: 5396

CH16MOD_2

CH16MOD_2

Date: 12/31/1969 Views: 4887

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693449

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693449

Front Starboard fuse stiffening for lift socket 6.

Alan and I noodled this design for a jig to hold the foam in place for cure on the way home the prior night.
I drilled the holes for the sheetrock screws only small enough to hold without stripping, yet easy enough to turn with your fingers.
I did a beautiful job of taping the flexible ruler on the cork side with 3M 375 packaging tape.
THE CORK SIDE WAS THE SIDE THAT WAS SUPPOSED TO BE AGAINST THE FOAM!
Oh well, we pulled it off after it got plenty tacky and completed 3 BID layup.
Y10-10-25

Date: 10/24/2010
Size:
Full size: 1350x1800
nextlast
first previous
Front Starboard fuse stiffening for lift socket 6.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 1/30 sec Date/Time Sun 24 Oct 2010 10:30:09 PM UTC
nextlast
first previous
Powered by Gallery v2.3