Login
EuropaOwners Recent Updates Front Starboard fuse stiffening for lift socket 8.
Advanced Search
View Slideshow (Fullscreen)

Recent Updates

1. Spar ramp 9. ... 65. Front... 66. Front... 67. Front... 68. Front... 69. Front... 70. Front... 71. Front... ... 190. Dan Bish's ...

Random Images

Ant_2_001

Ant_2_001

Date: 03/13/2009 Views: 5783

Third access cover 3.

Third access cover 3.

Date: 05/02/2009 Views: 6246

IMG_8181Ann

IMG_8181Ann

Date: 07/18/2008 Views: 4740

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693453

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693453

Front Starboard fuse stiffening for lift socket 8.

We needed two stops for the jig, one to keep the side with the screws from sliding backwards and one on the tunnel to keep it from sliding backwards.
We JB KWIKed the stops to 3M 375 packaging tape.
To get proper length we just clamped an extension onto the jig using 2 pieces of of 80 grit sandpaper to promote friction. The tip of the extension has a 1" x 2" load spreader on it.
Once assembled it needed a mixing stick spacer to get pretty close to perfect alignment of the jig.
Y10-10-25

Date: 10/24/2010
Size:
Full size: 1800x1350
nextlast
first previous
Front Starboard fuse stiffening for lift socket 8.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Sun 24 Oct 2010 10:31:15 PM UTC
nextlast
first previous
Powered by Gallery v2.3