Login
EuropaOwners Random Items Front Port fuse stiffening for lift socket 3.
Advanced Search
View Slideshow (Fullscreen)

Random Images

IMG_1683

IMG_1683

Date: 05/30/2010 Views: 14932

Using aux. tank to check suction head

Using aux. tank to check suction head

Date: 12/01/2013 Views: 6523

Front fuse conduit run 42.

Front fuse conduit run 42.

Date: 12/27/2010 Views: 9016

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 771663

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 771663

Front Port fuse stiffening for lift socket 3.

Foam is Floxxed in place. We taped 3M 375 to either side of the foam to make wetting out and flox cleanup a breeze. We then wet out for the 3 BID layup.
Alan had to disassemble our fixture, (reversing the parts), to make it a mirror of what was needed for the Starboard side.
This time we put tape on the shiny side of the ruler, (it didn't stick).
Y10-11-06

Date: 11/05/2010
Size:
Full size: 1800x1350
nextlast
first previous
Front Port fuse stiffening for lift socket 3.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Sat 06 Nov 2010 12:02:49 AM UTC
nextlast
first previous
Powered by Gallery v2.3