Date: 12/31/1969 Views: 8284
Date: 09/13/2010 Views: 3073
Date: 12/31/1969 Views: 3394
Date: 08/23/2023 Views: 152255
Date: 05/23/2007 Views: 555308
Port side bonded in place after tapping aluminium ring, and inserting cut down, scuff sanded and wet out with Redux 4-40 100 degree flat head screws. Screw heads and edge of aluminium ring packed with Redux/flox.