Login
EuropaOwners Recent Updates Pretty much the front is flight ready.
Advanced Search
View Slideshow (Fullscreen)

Recent Updates

1. Front... ... 36. Emergency... 37. Emergency... 38. Emergency... 39. Pretty much... 40. A shot to ... 41. Emergency... 42. Emergency... ... 142. Reinforcement

Random Images

Fuel_System_07

Fuel_System_07

Date: 01/23/2006 Views: 7969

IMG_0019

IMG_0019

Date: 07/18/2007 Views: 4911

DSCF0021_1

DSCF0021_1

Date: 10/26/2009 Views: 4911

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 704802

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 704802

Pretty much the front is flight ready.

Pretty much the front bracket is flight ready.
The two nuts got weight reduction, they need paint and the aft one will be Reduxed in place.
The star washer is bored.
You slide in the Series 6 cable with the aft bracket attached going forward through the pitch tube tunnel and thread it through this front mounting bracket.
With the large nut and star washer dangling and the threaded portion only a few inches through the bracket, you install the clevis fork jam nut and clevis fork (EZ to work on it at this location) then push things forward and install the star washer and front mounting nut, then hook up the clevis fork.
The coupler and threaded rod will be Reduxed to the cable after the coupler gets paint.
The master cylinder needs to get "up close and personal" with a two flute 1/2" ball end mill (on order from McMaster) to make a cable pocket in it.
May do some weight reduction on the Master Cylinder as well?

Y13-12-15

Date: 12/16/2013
Size:
Full size: 4896x3672
nextlast
first previous
Pretty much the front is flight ready.

Photo Properties

summary  details
Make SONY Model DSC-HX20V
Aperture Value f/3.2 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 4.46 mm
ISO 250 Metering Mode Multi-Segment
Shutter Speed Value 1/30 sec Date/Time Sun 15 Dec 2013 06:41:16 PM UTC
nextlast
first previous
Powered by Gallery v2.3