|
Threaded rod dimensions
Date: 12/16/2013
Views: 6486
|
|
|
The center hole was tapped and used for 1st test mount, a big lightening hole will eliminate it
Date: 11/27/2013
Views: 6481
|
|
|
Emergency Maneuver that starts with Heim? 7 of 13
Date: 12/16/2013
Views: 6475
|
|
|
You can see the pillow block is aft of the threads
Date: 12/13/2013
Views: 6413
|
|
|
Straight ahead
Date: 11/27/2013
Views: 6409
|
|
|
Cable Happy in Spar Tunnel 2
Date: 12/12/2013
Views: 6400
|
|
|
Eric Engineering increase in force needed when cable is deflected 2
Date: 12/03/2013
Views: 6379
|
|
|
3" wide x 1/8" thick 4130 Chrome Moly for bracket
Date: 11/28/2013
Views: 6366
|
|
|
Cable Happy near Fuel Selector and below Air-Brake Cable 1
Date: 12/12/2013
Views: 6353
|
|
|
Series 6 cable specifications 2 of 2
Date: 11/28/2013
Views: 6351
|
|
|
Emergency Maneuver that starts with Heim? 10 of 13
Date: 12/16/2013
Views: 6348
|
|
|
Mill round slot in master cylinder 2 of 12
Date: 12/23/2013
Views: 6312
|
|
|
Now you can see lightening holes onthe small offsetting plate
Date: 11/28/2013
Views: 6305
|
|
|
Mill round slot in master cylinder 12 of 12
Date: 12/24/2013
Views: 6300
|
|
|
Prior to work Y13-12-15 (compare to prior pic)
Date: 12/13/2013
Views: 6284
|
|
|
Half the weight was eliminated since I first cut steel
Date: 11/27/2013
Views: 6282
|
|
|
Cut down 1" aft threaded rod to .700"
Date: 12/13/2013
Views: 6264
|
|
|
Front Cable Mount with Lever in Up Position
Date: 12/12/2013
Views: 6254
|
|
|
New 1/4-28 nuts
Date: 11/29/2013
Views: 6218
|
|
|
You can see the locknut contacting
Date: 11/27/2013
Views: 6217
|
|