|
|
Results of fitting in situation.
Date: 11/27/2013
Views: 8411
|
|
|
Oops, fixed a dent I made with a C-Clamp when testing spar Adel clamp bracket, Q-Cel, 1 BID and Peel-Ply
Date: 11/30/2013
Views: 9042
|
|
|
|
Mill round slot in master cylinder 5 of 12
Date: 12/23/2013
Views: 9540
|
|
|
I'm going to Redux the nut in place and Redux/Flox the thread extender hang-over
Date: 12/13/2013
Views: 7113
|
|
|
|
Temporary mount using 1 flat head 1/4-28
Date: 12/13/2013
Views: 8019
|
|
|
Length of coupler is ~ .855" cut down from 1". 9.5 times two is 19, so this allows minimum of 19 threads of engagement
Date: 12/13/2013
Views: 6983
|
|
|
|
A shot to show where the threads end
Date: 12/16/2013
Views: 7635
|
|
|
Emergency Maneuver that starts with Heim? 2 of 13
Date: 12/16/2013
Views: 9616
|
|
|
|
Prior to work Y13-12-15 (compare to prior pic)
Date: 12/13/2013
Views: 8327
|
|
|
Front Cable Mount with Lever in Down Position
Date: 12/12/2013
Views: 8031
|
|
|
|
Eric Engineering increase in force needed when cable is deflected 2
Date: 12/03/2013
Views: 8062
|
|
|
Mill round slot in master cylinder 7 of 12
Date: 12/23/2013
Views: 8908
|
|
|
|
Front Cable Mount with Lever in Down Position
Date: 12/12/2013
Views: 7595
|
|
|
Action of Flap Cross Tube .mov
Date: 12/13/2013
Views: 5722
|
|
|
|
Cut down Heims to 1.700"
Date: 12/13/2013
Views: 7185
|
|
|
Front HardPoint 3
Date: 12/27/2013
Views: 10726
|
|
|
|
Nut-plates
Date: 11/27/2013
Views: 10738
|
|
|
I failed a bearing on purpose
Date: 11/27/2013
Views: 15472
|
|
|
|
Cable Happy near Fuel Selector and below Air-Brake Cable 1
Date: 12/12/2013
Views: 8804
|
|
|
Cable Happy near Fuel Selector and below Air-Brake Cable 2
Date: 12/12/2013
Views: 8220
|
|