|
|
Mill round slot in master cylinder 3 of 12
Date: 12/23/2013
Views: 9560
|
|
|
Using fore and aft the supplied by Europa for push-rod jam nuts that are .155" thick
Date: 12/13/2013
Views: 6880
|
|
|
|
OK, we are ready for in situation fitting to get correct length and angle of 1" tube
Date: 11/27/2013
Views: 7141
|
|
|
Cable Happy in Spar Tunnel 1
Date: 12/12/2013
Views: 9017
|
|
|
|
Reinforce gear tunnel front cable mount with aluminium
Date: 11/30/2013
Views: 6685
|
|
|
Front HardPoint 10
Date: 12/31/2013
Views: 12320
|
|
|
|
Rod end clevis fork ground down to 1.975" (again minimum 9.5 threads of engagement)
Date: 12/13/2013
Views: 9041
|
|
|
5.4 oz. for bracket, pillow block and pillow block mounting hardware
Date: 11/29/2013
Views: 8920
|
|
|
|
Front HardPoint 6
Date: 12/27/2013
Views: 10420
|
|
|
The center hole was tapped and used for 1st test mount, a big lightening hole will eliminate it
Date: 11/27/2013
Views: 8411
|
|
|
|
Shot of 1/4" hardware spacers
Date: 11/29/2013
Views: 8967
|
|
|
Action of Flap Cross Tube .mov
Date: 12/13/2013
Views: 5450
|
|
|
|
Aft mount
Date: 12/13/2013
Views: 6622
|
|
|
Made spacer a few thousands shorter than the pillow block hole
Date: 11/29/2013
Views: 7724
|
|
|
|
Nice-a-fit!
Date: 11/27/2013
Views: 7163
|
|
|
Weight: 2.5 oz.
Date: 11/29/2013
Views: 7229
|
|
|
|
I failed a bearing on purpose
Date: 11/27/2013
Views: 14881
|
|
|
Mill round slot in master cylinder 1 of 2
Date: 12/23/2013
Views: 7596
|
|
|
|
Oops, a few air bubles on aft mount reinforcemelay-up, drilled holes, filled with Aeropoxy, plugged with dry flox and Peel-Ply
Date: 11/30/2013
Views: 8445
|
|
|
Series 6 Push-Pull cable Weight and Length
Date: 12/16/2013
Views: 9576
|
|