|
|
Igus bracket and spacers
Date: 11/27/2013
Views: 7309
|
|
|
3" wide x 1/8" thick 4130 Chrome Moly for bracket
Date: 11/28/2013
Views: 8025
|
|
|
|
Glass in reinforcement
Date: 11/27/2013
Views: 7022
|
|
|
2011 and 4032 aluminium stock for spacers
Date: 11/28/2013
Views: 9103
|
|
|
|
You can see the locknut contacting
Date: 11/27/2013
Views: 8162
|
|
|
Shot of 1/4" hardware spacers
Date: 11/29/2013
Views: 8977
|
|
|
|
Half the weight was eliminated since I first cut steel
Date: 11/27/2013
Views: 8065
|
|
|
3.2 oz. for aft bracket
Date: 11/29/2013
Views: 7562
|
|
|
|
The center hole was tapped and used for 1st test mount, a big lightening hole will eliminate it
Date: 11/27/2013
Views: 8420
|
|
|
1/4-28 jam nuts
Date: 11/27/2013
Views: 7292
|
|
|
|
Besides a little paint and Redux, Flight Ready
Date: 12/16/2013
Views: 12694
|
|
|
Ready for final assembly
Date: 11/29/2013
Views: 7157
|
|
|
|
Oops, a few air bubles on aft mount reinforcemelay-up, drilled holes, filled with Aeropoxy, plugged with dry flox and Peel-Ply
Date: 11/30/2013
Views: 8450
|
|
|
Ready to install nut-plates
Date: 11/27/2013
Views: 9712
|
|
|
|
ESTM-20 Specification Sheet
Date: 11/28/2013
Views: 7853
|
|
|
New 1/4-28 nuts
Date: 11/29/2013
Views: 7886
|
|
|
|
Nut-plates
Date: 11/27/2013
Views: 10132
|
|
|
Just needs a pullin
Date: 11/27/2013
Views: 9015
|
|
|
|
Oops, several dents being repaired in Port seat base, Q-Cel, 1 BID, Peel-Ply
Date: 11/30/2013
Views: 9036
|
|
|
Igus bearings
Date: 11/27/2013
Views: 12494
|
|