|
|
Besides a little paint and Redux, Flight Ready
Date: 12/16/2013
Views: 12690
|
|
|
Igus bearings
Date: 11/27/2013
Views: 12491
|
|
|
|
Nut-plates
Date: 11/27/2013
Views: 10129
|
|
|
Reinforcement
Date: 11/27/2013
Views: 10088
|
|
|
|
Ready to install nut-plates
Date: 11/27/2013
Views: 9710
|
|
|
You really can't see with the pillow block in place, but lightening holes under contact area
Date: 11/27/2013
Views: 9113
|
|
|
|
2011 and 4032 aluminium stock for spacers
Date: 11/28/2013
Views: 9099
|
|
|
Oops, several dents being repaired in Port seat base, Q-Cel, 1 BID, Peel-Ply
Date: 11/30/2013
Views: 9032
|
|
|
|
Just needs a pullin
Date: 11/27/2013
Views: 9009
|
|
|
Shot of 1/4" hardware spacers
Date: 11/29/2013
Views: 8971
|
|
|
|
5.4 oz. for bracket, pillow block and pillow block mounting hardware
Date: 11/29/2013
Views: 8927
|
|
|
Oops, fixed a dent I made with a C-Clamp when testing spar Adel clamp bracket, Q-Cel, 1 BID and Peel-Ply
Date: 11/30/2013
Views: 8526
|
|
|
|
Oops, a few air bubles on aft mount reinforcemelay-up, drilled holes, filled with Aeropoxy, plugged with dry flox and Peel-Ply
Date: 11/30/2013
Views: 8449
|
|
|
The center hole was tapped and used for 1st test mount, a big lightening hole will eliminate it
Date: 11/27/2013
Views: 8416
|
|
|
|
Straight ahead
Date: 11/27/2013
Views: 8227
|
|
|
You can see the locknut contacting
Date: 11/27/2013
Views: 8157
|
|
|
|
Half the weight was eliminated since I first cut steel
Date: 11/27/2013
Views: 8063
|
|
|
3" wide x 1/8" thick 4130 Chrome Moly for bracket
Date: 11/28/2013
Views: 8023
|
|
|
|
Now you can see lightening holes onthe small offsetting plate
Date: 11/28/2013
Views: 7919
|
|
|
New 1/4-28 nuts
Date: 11/29/2013
Views: 7885
|
|