Login
EuropaOwners Random Items Front HardPoint 1
Advanced Search
View Slideshow (Fullscreen)

Random Items

1. Mill round ... ... 16. Front... 17. Mill round ... 18. Front... 19. Front... 20. Front... 21. Mill round ... 22. Results of ... ... 33. Front...

Random Images

rp_europa_geofs_2

rp_europa_geofs_2

Date: 10/03/2005 Views: 5995

RadioJacks02Ann_001

RadioJacks02Ann_001

Date: 05/22/2005 Views: 4627

approaching Wicklow head Ireland

approaching Wicklow head Ireland

Date: 08/27/2011 Views: 8422

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 704962

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 704962

Front HardPoint 1

Before removing glass and foam from the outboard side of the tunnel, Art bonded some 1.5" aluminium drill bushings in place with JB KWIK to 3M 375 packaging tape that was scuff sanded.
Ended up the tape was not quite as stuck to the tunnel as I would have liked, so put some dabs of JB on top and bottom of the drill bushings directly to the paint.

Y13-12-27

Date: 12/27/2013
Size:
Full size: 4896x3672
nextlast
first previous
Front HardPoint 1

Photo Properties

summary  details
Make SONY Model DSC-HX20V
Aperture Value f/3.2 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode, Return light detected Focal Length 4.72 mm
ISO 100 Metering Mode Multi-Segment
Shutter Speed Value 1/10 sec Date/Time Thu 26 Dec 2013 09:08:48 PM UTC
nextlast
first previous
Powered by Gallery v2.3