Login
EuropaOwners Most Viewed Items 1/2" ball end-mill on order (McMaster) to to mill a pocket in the brake master cylinder directly above the mounting holes
Advanced Search
View Slideshow (Fullscreen)

Most Viewed Items

1. Mill round ... ... 13. Cable Happy... 14. Coupler... 15. Emergency... 16. 1/2" ball... 17. Cable Happy... 18. Emergency... 19. Emergency... ... 63. Action of...

Random Images

01052003204709_G

01052003204709_G

Date: 12/31/1969 Views: 5144

IMG_6995

IMG_6995

Date: 10/21/2013 Views: 13372

DSCN6091

DSCN6091

Date: 10/11/2009 Views: 6684

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 771737

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 771737

1/2" ball end-mill on order (McMaster) to to mill a pocket in the brake master cylinder directly above the mounting holes

I am going to Redux the aft bracket to the cable.
The front bracket needs to be assembled in place.
Again I will turn off some material from the nuts to save a little weight, then will Redux the aft nut to the cable.
The forward nut use the stainless lock washer I bored to the proper size. The supplied washer was huge and McMaster didn't sell the right size. I purchased the next smaller size and bored it.

Y13-12-12

Date: 12/13/2013
Size:
Full size: 4896x3672
nextlast
first previous
1/2" ball end-mill on order (McMaster) to to mill a pocket  in the brake master cylinder directly above the mounting holes

Photo Properties

summary  details
Make SONY Model DSC-HX20V
Aperture Value f/3.2 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 4.45 mm
ISO 125 Metering Mode Multi-Segment
Shutter Speed Value 1/30 sec Date/Time Fri 13 Dec 2013 01:53:22 AM UTC
nextlast
first previous
Powered by Gallery v2.3