Date: 03/17/2008 Views: 3025
Date: 10/20/2010 Views: 3083
Date: 10/11/2009 Views: 3177
Date: 08/23/2023 Views: 172319
Date: 05/23/2007 Views: 566524
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.