Date: 01/23/2006 Views: 4207
Date: 04/08/2007 Views: 3096
Date: 05/20/2007 Views: 2883
Date: 08/23/2023 Views: 215361
Date: 05/23/2007 Views: 584850
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.