Date: 12/08/2005 Views: 2565
Date: 10/25/2009 Views: 2676
Date: 09/30/2009 Views: 4966
Date: 08/23/2023 Views: 184152
Date: 05/23/2007 Views: 571591
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.