Date: 06/07/2008 Views: 5803
Date: 05/12/2009 Views: 5647
Date: 08/08/2010 Views: 4344
Date: 08/23/2023 Views: 693416
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.