Date: 12/31/1969 Views: 4259
Date: 08/30/2007 Views: 4924
Date: 12/31/1969 Views: 4231
Date: 08/23/2023 Views: 843912
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.