Date: 06/13/2007 Views: 3028
Date: 05/04/2004 Views: 2186
Date: 04/10/2012 Views: 11110
Date: 08/23/2023 Views: 137397
Date: 05/23/2007 Views: 547379
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.