Login
EuropaOwners Most Viewed Items DoorMount22Ann
Advanced Search
View Slideshow (Fullscreen)

Most Viewed Items

1. FuelFiller0... ... 37. FuelFiller1... 38. TrimWiring0... 39. WingSet00 40. DoorMount22Ann 41. WingSetC10Ann 42. InstrumentP... 43. WingSet83Ann ... 84. WingSet56Ann

Random Images

Inner flap string guide 4

Inner flap string guide 4

Date: 08/04/2013 Views: 7016

First ply being held flat, then a bit of heat added.

First ply being held flat, then a bit of heat added.

Date: 01/11/2010 Views: 6325

IMG_0248post

IMG_0248post

Date: 09/14/2010 Views: 4875

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 704514

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 704514

DoorMount22Ann

When I went around front, I noticed that the starboard door frame must have slipped between the tests and the drilling because there was a significant gap between the frame and fuselage. Well crap... I don't think there is anything I can do now. I guess this is one of the reasons that lightweight filler was invented.

Spent the rest of the day working on the port door. Same as before. Bond, test, note interference, break bond, apply abrasives, clean bond area, bond, etc... I think I may have a decent fit, but won't know till tomorrow.

Date: 07/07/2004
Full size: 640x480
nextlast
first previous
DoorMount22Ann

Photo Properties

summary  details
Make NIKON Model E775
Aperture Value f/2.8 Color Space Uncalibrated
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 5.8 mm
ISO 100 Metering Mode Multi-Segment
Shutter Speed Value 0.03 sec Date/Time Wed 07 Jul 2004 05:08:06 PM UTC
IPTC: Caption
nextlast
first previous
Powered by Gallery v2.3