Date: 04/30/2005 Views: 6167
Date: 06/28/2013 Views: 14565
Date: 08/27/2004 Views: 3683
Date: 08/23/2023 Views: 726224
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.