Date: 06/08/2010 Views: 13903
Date: 05/07/2009 Views: 6544
Date: 10/12/2009 Views: 8288
Date: 08/23/2023 Views: 693431
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.