Date: 03/17/2005 Views: 5811
Date: 12/31/1969 Views: 5170
Date: 10/30/2007 Views: 6417
Date: 08/23/2023 Views: 704802
The overhead panel in place and the wiring for the lights completed. After the nutplates have been installed, the whole assembly will have to be primed and Zolatoned before the wiring is connected.